CTC Firefighting

CTC Firefighting

Thursday, September 1, 2011

Firefighter I 9/1/11

Journal:  How can safety be practiced in the fire service?

Objectives:

1.  Read chapter 3 Fire Behavior
2.  Answer end of chapter questions
3.  Chapter 2 Safety Quiz
4.  PT
5  Module 3 Fire Behavior PPt (Up to slide 9)

"New" Cascade System Arrives

CTC Fire took delivery of a "new" loner cascade system with compressor on Wednesday.  The actual new cascade system is still being built and will be delivered in October.  The loner system from Air Systems of SC will greatly increase the efficiency of the CTC Firefighting class allowing students to be able to fill up their SCBA cylinders during class and allowing for more time "on air."  A special thanks goes to the CTC administration for making the purchase of the new cascade system possible.

First Responders 8/31/11

Journal:  Diagram the command staff and the general staff.

Objectives:

1.  NIMS-ICS Review
2.  NIMS-ICS 100 Retest

Wednesday, August 31, 2011

Introduction to Firefighting 8/31/11

Journal:

What are the steps to donning a SCBA.

Objectives:

1.  PT
2.  PPE Donning
3.  Maze



Tuesday, August 30, 2011

Firefighter II 8/30/11

Journal:  Describe the steps in donning your PPE. 

Objectives:

1.  PT
2.  1 Firefighter low shoulder carry
3.  1 Firefighter flat raise
4.  Tie the halyard with a clove hitch and overhand safety
5.  2 Firefighter low shoulder carry
6.  2 Firefighter flat raise
7.  Leg lock off of a ladder



Firefighter I 8/30/11

Journal:  Define the following ICS terms:  Span of control, division of labor, and unity of command.

Objectives:

1.  Read Chapter 2
2.  Answer the end of chapter questions
3.  Module 2 Safety PowerPoint
4.  PT

First Responder 8/29/11

Journal:  Describe the history of EMS during and directly after the Civil War.

Objectives:

1.  ICS-100
2.  ICS-100 Test